
Case Study
The Dock Office
Explore
Client
The Dock Office
Main Contractor
Marcus Worthington and Co Ltd
Architect
DV Architects
Project Value
£1.25m
Sector
Description
The Dock Office is positioned prominently in the heart of Salford Quays, tastefully refurbished to respect its Grade II listing but to also introduce a modern theme.
Quest offered a traditional high performing Technal window for the lower floors coupled with a cap-less glass box projecting from the roof of the existing building, using Technal’s Toggle glazed system coupled with black ceramic glazing.
-
-
Technal's Toggle glazed system creates flush glass façades with visibly less aluminium.
-
The Soleal window range offers exceptional thermal performance, including weather resistant properties.
-
-
Products on show
Technal thermally broken FY / Soleal window system
Technal MX SSG toggle retained (capless) curtain walling (52mm)
Wicona Wicstyle 65/75FR fire rated door suite
Wicona Wicline 65/75 FR fire rated window suite